May 15, 2024
Oct 8, 2012
Wind turbine vessel reaches Port of Tyne Companies and organisations mentioned: National Renewable Energy Centre, SeaRoc, Vestas, Deepwater Wind, US Army Corps of Engineers, the US Department of the Interior’s Bureau of Ocean Energy Management
Oct 1, 2012
Sheringham Shoal offshore wind farm opens Companies and organisations mentioned: Statoil, Statkraft, Scira Offshore Energy; European Wind Energy Association; RenewableUK, Vattenfall, RWE
Oct 1, 2012
A relatively good accident record shows the offshore wind industry is taking health and safety seriously. But an incident at China's Huaneng onshore wind farm shows health and safety is an ever learning segment of this industry.
Sep 26, 2012
As the famous saying goes “success breeds success” so it is no surprise that leading industrial turbine manufacturer GE Power & Water have taken the proactive approach in 2013 to showcase their excellence as it relates to wind energy.
Aug 10, 2012
Priority one for any wind farm manager: Keep workers safe. It is more important than any other consideration such as cost or operational efficiency.
Jul 23, 2012
Installation of new Indian wind capacity has slowed, since the Ministry of New and Renewable Energy (MNRE) slipped the March 31 deadline for extending to the 2012 fiscal year the Generation-Based Incentives (GBI) scheme that helped develop record wind capacity in 2010 and 2011.
Jul 16, 2012
As governments continue to grapple to find just the right balance of stimulus to encourage and maintain their national wind energy markets, generation-based incentives (GBI) are increasingly seen as a solid way to achieve this while also eliminating inequities of the past.
Jul 10, 2012
Amit Kansal, the Managing Director for Vestas India, this week committed to participating in the Wind Development Forum, taking place this 6-7 September in Delhi.
May 17, 2012
Following interviews with experts from the Indian wind industry, Wind Energy Update have compiled a “State of the Industry” report which is now available to download.
Apr 27, 2012
What options are available to developers, operators and suppliers as India's wind farms exit their warranty phase?
Apr 27, 2012
Enrique García, Gamesa’s Fibramatic Chief Engineer, explains how Gamesa has resolved transportation issues for the world’s longest wind turbine blade, and how blade O&M has been designed in.
Apr 20, 2012
After more than a century of running a system that Thomas Edison would still recognize, the addition of wind and other renewables to their energy portfolio is causing the operators of America's electricity grid to rethink how they manage this critical infrastructure and the power that it delivers.
Apr 10, 2012
Andy Poon, Director, Romax Technology on avoiding onshore and offshore wind turbine failure and how operators can achieve maximum output.
Mar 30, 2012
$40billion worth of turbines will come out of their warranty period in 2012, or to put it another way somewhere between 20,000-40,000 turbines will need their future O&M strategy accounted for.
Mar 27, 2012
The wind energy sector is set for a development boom for the rest of this decade.
Reuters Events is part of Reuters News & Media Ltd, 5 Canada Square, Canary Wharf, London, E14 5AQ. Registered in England and Wales: 2505735.
© Reuters Events 2024 | TERMS OF USE | PRIVACY POLICY | CONTACT US | +44 (0) 207 375 7575